Muzha bus shelter public art project rusting before completion

Aug 23, 2026

A NT$4.13 million public art bus shelter in Taipei's Muzha district has rusted before it was ever finished, and the city says it will not sign off until the contractor fixes it.

  • The shelter, called "Clustered Floating Isle," cost NT$4.13 million and started rusting before opening, drawing mockery from residents who nicknamed it "rust mushroom."
  • Taipei Mayor Chiang Wan-an said the piece is still a trial build, not a finished work, and the city will only accept it once quality and safety standards are met.
  • Chiang also weighed in on President Lai Ching-te's idea of moving the legislature and cabinet to Taichung, calling it far-reaching and something that needs careful study and more talks.
  • On the year-end local elections, Chiang dodged questions about backing a Taiwan People's Party candidate over a sitting KMT councilor, saying the goal is the best overall result and that allies should climb the mountain together.

Outlook: The city will keep the shelter unaccepted until the rust is fixed, and Chiang looks set to stay vague on opposition-camp election deals for now.

← Latest · Archive